WATER QUALITY BASED EFFLUENT LIMITATION STUDY
Florida
NewFields Engineers were subcontracted to conduct the necessary environmental and modeling investigations associated with a Level II Water Quality Based Effluent Limitations (WQBEL) study. The WWTP is currently operating at a capacity of 0.85 MGD and is discharging into an adjucent freshwater canal. The client is seeking a discharge permit for portions of the facility's effluent into the adjucent canal...
GEORGIA ENVIRONMENTAL PROJECT V. CITY OF ATLANTA NPDES CHARACTERIZATION
Georgia
NewFields engineers served as a technical advisor to the Court in the resolution of a river impact dispute between the City of Atlanta and the Georgia Environmental Project. The project arose from a Georgia Environmental Project lawsuit against the City of Atlanta claiming damage due to numerous Chattohoochee River discharge permit violations from City of Atlanta wastewater treatment plants...
BUILDING DEMOLITION, ASBESTOS ABATEMENT AND HAZARDOUS MATERIALS REMOVAL
Maryland
NewFields engineers were retained to prepare and design specifications for the removal of asbestos, polychlorinated biphenyls (PCB), and other hazardous substunces at a former newspaper printing plant that occupied a square block in downtown Baltimore and was demolished following project completion...